
The highest report from the President of the Builders Guild, His Honor, to General Webman
Listen, glorious and powerful Lord of the lands, General Webman!
With reverence and the greatest respect, I hasten to inform Your Excellency: The Great Real Estate Repair Reform is now solemnly concluded.
Thanks to your wise order, from now on every property owner has the opportunity to keep the monasteries in perfect order (30/30) , without waiting for the final destructive day. Like the artisan spirit, building materials are consumed drop by drop, eliminating the need for large, one-time sacrifices.
The ancient tradition of free choice has not disappeared: both repair methods are preserved: manual and automatic.
It is most mercifully arranged that automatic repairs maintain the condition of the dwellings daily, not allowing destruction to touch their walls and ceilings.
And, oh wonder of wonders! With a single touch of a finger, the owner gains the power to see the materials needed for a month to erect and preserve the palaces in everlasting beauty.
His Serene Highness's greatest indulgence is shown in the transition period: until the tenth of May, automatic repairs will only cover homes that are 10 days or less away from the restoration deadline, eliminating confusion in the hearts of homeowners.
Not content with this, you, oh magnanimous General, have granted all owners +3 days of durability, and all shelters have been reinforced to a state of 15 days before repair.
May your name shine forever! May the Great Restorative Reformation be celebrated in song and chronicles!
With unfailing respect and awe,
Chairman of the Guild of Builders
in the glorious and memorable year